other requirements

1. Purge the assembled valve with nitrogen for at least 1 minute.

2. The air tightness test must be performed with pure nitrogen.

3. Encapsulate after passing the air tightness test, seal with a clean polyethylene cap, soak the polyethylene cap with an organic solvent before use, and wipe it clean.

4. Then seal it with a vacuum bag.

5. Final packing.

6. Measures should be taken to ensure that the package is not damaged during transportation.